★★★★★ Google 5 Star Rating·Professional Engineers Ontario·Clean Tech Network

Electrical Panel Upgrades
That Make Sense for Your Home

We analyze your actual electrical usage before recommending upgrades. Many 200A services have more capacity than you think, and when you do need an upgrade, we right-size it for your complete electrification roadmap.

Get Your Complimentary Electrification Check →

Planning your whole electrification? See the Home Electrification Roadmap →

Engineered load calculationsData before dollarsRight-sized, never oversold
The LDC Data Method

Every assessment runs on your utility's 15-minute interval data, analyzed under an engineered load calculation (OESC Rule 8-106(8)). Measured demand, not assumptions.

The Panel Upgrade Problem Nobody Talks About

3 Ways Homeowners Overpay

💸

Unnecessary Upgrades

Contractors add up nameplate ratings and say "you need 400A." But most 200A services have 40 to 60% unused capacity that engineering analysis can unlock.

🔄

Piecemeal Upgrades

Upgrade for the EV charger today. Then again for the heat pump. Then the pool. Each time you're paying for panel work that could have been done once.

🏚️

Stuck on 100A

Older Toronto homes with 100A service are genuinely limited. But even here, the right approach matters: 200A solves most needs without jumping to 400A.

Our Approach: Data Before Dollars

Typical Contractor vs. Energable

TYPICAL CONTRACTOR

  • Adds up breaker ratings: "You need 400A"
  • Quotes the upgrade without checking usage
  • No consideration for future loads
  • $30K to $50K for 400A you may not need

THE ENERGABLE APPROACH

  • Analyze 12+ months of your Toronto Hydro data
  • Calculate actual peak with diversity factors
  • Plan all future loads: EV, heat pump, pool, battery
  • Right-size the solution, often no upgrade needed
Panel Upgrade Options Based on Your Situation

The Right Solution Depends on Your Data

100A → 200A Upgrade

The essential upgrade for older Toronto homes.

Supports EV charging, heat pumps, modern appliances, and full home electrification. Typical investment: $8,000 to $15,000, including Toronto Hydro coordination.

  • New 200A panel + meter base
  • Service entrance upgrade
  • Toronto Hydro coordination
  • ESA inspection & permit

400A Service Upgrade

For large estates with extensive demands.

Multiple EVs, pools, workshops, guest houses. Only recommended when data proves necessity. Typical investment: $30,000 to $50,000+, including Toronto Hydro infrastructure.

  • Complete service replacement
  • Toronto Hydro transformer work
  • New 400A distribution system
  • Maximum future capacity

Not sure which you need? That's exactly why we start with a load assessment. The data tells us what's right for your home.

Real Example: Leaside, Toronto

How We Saved $30K+ on a "Required" Upgrade

Homeowner was told they needed 400A. Our engineering analysis told a different story.

🏠 The Situation

🔌 EV Charger (Tesla Wall Connector)60A
🏊 Pool Heat Pump (140k BTU)50A
💧 Pool Equipment (pump, salt, UV)25A
🔥 Patio Heaters (3x infrared)43A

Contractor's assessment: "That's 178A of new loads. You need 400A." Budget $35K to $50K.

📊 Our Engineering Analysis

Historical peak (14 months of data)82A
New loads, with diversity factors+69A
Calculated peak demand151A ✓

200A service is sufficient with a 49A safety margin. Subpanel distribution handles all new loads.

$30,000+
Client savings
200A
Service kept
49A
Safety margin
How We Right-Size Your Upgrade

4 Steps, Data First

1

Complimentary Load Assessment

Send your project details. We confirm receipt within 2 business days and reply with a full review within 3.

2

Data Analysis

We analyze your Toronto Hydro consumption to find actual peak demand.

3

Engineering Design

Engineered load calculation accounting for all current and future loads.

4

Installation

Licensed electricians complete the work with ESA inspection and full documentation.

The Engineering Partner Toronto Trusts

Licensed Energy Professionals

Industry-leading credentials that ensure excellence and compliance.

PEO

Professional Engineers Ontario

Professional engineering accountability on every project, by Ontario-licensed engineers

CEM

Certified Energy Managers & Auditors

Energy efficiency experts with the Association of Energy Engineers (AEE)

ECRA

Licensed Electrical Contractor

Partnered with Morava Electric ECRA/ESA #7008817

TESLA

Tesla Certified Installer

Certified for Powerwall 3 battery systems and Wall Connector EV chargers

HYDRO

Toronto Hydro Cleantech

Service Network Member for electrification & energy efficiency solutions

Straight Answers

Panel Upgrade Questions

The kind we would give before you commit a dollar of capital. Tap a question.

I have 100A service. Do I definitely need to upgrade?
For most modern electrical needs, EV charging, heat pumps, induction cooking, yes, 100A is typically insufficient. We recommend upgrading to 200A, which future-proofs your home for full electrification. The good news: 200A handles almost everything, so you likely won't need 400A.
Another contractor said I need 400A. Is that right?
Maybe, but often not. Contractors typically add up nameplate breaker ratings, which dramatically overstates actual usage. Our engineering analysis examines 12+ months of Toronto Hydro data to determine your real peak demand. In many cases, 200A with smart load management handles everything at a fraction of the cost.
How long does a panel upgrade take?
100A to 200A: typically 1 to 2 days of installation work, plus 2 to 4 weeks for Toronto Hydro coordination and permits. 200A to 400A: more complex, 3 to 5 days of installation, plus 4 to 8 weeks for Toronto Hydro transformer work and infrastructure upgrades.
What if I want to add more loads later, EV, heat pump, pool?
That's exactly why we create a full electrification roadmap during your assessment. We plan for everything you might add, second EV, heat pump, induction range, hot water heater, pool equipment, so your electrical infrastructure is sized correctly from day 1. No expensive rework later.
What's included in the capacity assessment?
We analyze your Toronto Hydro consumption data (12+ months), inspect your current panel and service, discuss all your future plans, and provide a professional engineering load calculation showing exactly what your current service can handle, and what upgrades (if any) you actually need. This gives you data to make an informed decision.
Complimentary Engineering Review · 3 Business Days

Your Complimentary Electrification Check

Get an engineering assessment that shows you what you actually need, not what a quick calculation suggests. We confirm receipt within 2 business days and send your full assessment within 3, usually with a clear "yes, here's how" or "here's what we'd want to look at first."

Prefer to talk it through first? Call (416) 670-4030

Got utility bills, plans, permits, photos, or contractor quotes ready? Attach them here. Up to 5MB per file. PDF, JPG, PNG, CSV, XLSX, DWG.

If you didn't upload above, just check what you have. We'll email you within 2 business days to coordinate.

We confirm receipt within 2 business days, then send your full assessment within 3 business days. No sales calls. Your details stay confidential.