A new duplex on one 200 A service
two meters, two panels
A full rebuild into an owner's home and a basement suite. We calculated both units by the Code's duplex method, fit them on a single 200 A service with a meter and panel for each, and wired the house from the studs out.
Check My Home →Prefer to talk? Call (416) 670-4030
A house rebuilt to the studs by a custom builder, as an owner's home upstairs and a one-bedroom suite below. Each unit needed its own meter and panel. The suite is heated electrically, with four zones of radiant floor and a mini-split, and both units have electric ranges, dryers and water heaters. Added up unit by unit, the panels come to more than 200 A, so the question was whether one 200 A service would do or the house needed something larger.
- Load calculation for each unit by the Ontario Electrical Safety Code: about 109 A for the upper unit and 104 A for the suite, then combined by the duplex method at 100% of the larger plus 65% of the smaller, for 176 A
- Toronto Hydro service upgrade to 200 A, with a dual meter centre, mast and weatherhead, coordinated before the stucco went on
- A 200 A, 42-circuit panel for the owner and the shared mechanicals, and a 125 A, 32-circuit panel for the suite, so the suite has its own meter and its own bill
- Rough-in timed to the framing: 60+ pot lights, 70+ receptacles and 25+ dedicated circuits, including four-zone radiant floor heat and a mini-split in the suite
- An electrification roadmap while the walls were open, with an EV conduit and reserved breaker space so a charger can go in later without opening walls
- Radiant floor commissioned with a thermal camera, confirming all four zones heat evenly before the suite was handed over
- ESA rough-in, floor heating and final inspections, with a Certificate of Acceptance for each unit
Two independent homes on one 200 A service, calculated at 176 A with room to spare. Each unit has its own meter and panel, both were accepted by ESA, and the house is ready for an EV charger when the owners want one.
Two units, one service, by the Code's duplex method
Each unit is calculated on its own, then the Code combines them, because two households rarely peak at the same time.
From the studs out
A new duplex on one 200 A service








Load assessment first
Then the right install
Building or converting to a duplex? Send your drawings and the equipment list. We will run the load calculation for both units, size the service and send a fixed quote within 1 to 2 business days.
Get My Load Check →Straight Answers
The kind we would give before you commit a dollar of capital. Tap a question.
Do I need a 400 A service for a duplex in Toronto?
Can a basement suite have its own meter and panel?
What should I rough in while the walls are open?
Get a quote
Tell us about your home or building
Choose your property type and what you need. Send the address and a few details, and we will reply with a fixed quote.