A subpanel in a new bedroom
shielded and set back
A second-storey addition needed its own 40 A subpanel for electric heat and a mini-split, and the best spot was a bedroom storage wall. We shielded the panel and used the room's layout to keep the field at the bed to a fraction of a milligauss.
Check My Home →Prefer to talk? Call (416) 670-4030
A rear second-storey addition, built by a general contractor. The main panel was full and on the far side of the basement, with no easy path up. Then the owners added radiant baseboard heat and a ductless mini-split, which needed dedicated capacity close by. The practical place for a subpanel was the storage wall of a new bedroom, and the owners wanted the room to stay a quiet place to sleep.
- Load assessment on the 200 A service, then a 40 A subpanel in the addition, fed from the main panel by a long home run down an existing cavity
- Ferromagnetic shield plate on the wall behind the subpanel, bonded to the panel's grounding, to redirect the magnetic field and drain the electric field
- Layout checked from the permit drawings: about 2.7 m from pillow to panel and 2.2 m to the heater, on cable whose paired conductors cancel most of their own field
- Circuits for the baseboard heater, mini-split, bedroom and bidet; a rerouted 30 A A/C circuit; bathroom floor heating; dim-to-warm pot lights and smart dimmers
- ESA permit revisions, inspections and the Certificate of Acceptance, coordinated with the builder's schedule
A bedroom with its own heat, cooling and capacity, a subpanel the inspector accepted, and a layout where distance alone cuts the panel's field at the bed to about 1/685th before the shield is counted. The design aim is under 1 milligauss at the pillow, even on a winter night.
Why distance matters, the field fades fast
A panel acts as a compact source, and its magnetic field falls with the cube of the distance. Share of the field at the panel face, before shielding.
Lighting that warms as it dims
A subpanel in a new bedroom







Load assessment first
Then the right install
Planning an addition or renovation? Send your address, a photo of your panel and 12 months of Toronto Hydro data. We will plan the capacity and layout, and send a fixed quote within 1 to 2 business days.
Get My Load Check →Straight Answers
The kind we would give before you commit a dollar of capital. Tap a question.
Can an electrical panel go in a bedroom?
Does shielding a panel reduce EMF?
Why add a subpanel for an addition?
Get a quote
Tell us about your home or building
Choose your property type and what you need. Send the address and a few details, and we will reply with a fixed quote.