★★★★★ Google 5 Star Rating·Tesla Certified Installer·Toronto

Commercial EV Charging,
Engineered From the Capacity Up

The chargers are the easy part. We assess your service capacity first, with real interval data, then design fleet, workplace, and MURB charging that uses what you have and adds only what you need.

Schedule EV Charging Assessment →

A complimentary capacity review comes first. Chargers second.

Up to 60% less infrastructure costRebates coordinatedOne accountable team

The Capacity Question Comes First

60%
Up to 60% less infrastructure cost with engineered smart load management
Often 0
Service upgrades needed once the load is measured and managed
15-min
Utility interval data granularity our capacity analysis runs on
Adoption Is Accelerating, Infrastructure Isn't

What Property Owners Face vs. Our Turnkey EV Solution

THE PROBLEM

  • Insufficient electrical capacity for EV charging loads
  • Tenant and employee demand for workplace charging
  • Complex coordination with utility and electrical contractors
  • Unclear ROI and billing management challenges
  • Property value and competitive disadvantage concerns

OUR TURNKEY EV SOLUTION

  • Complete electrical infrastructure design and upgrades
  • Smart load management to optimize existing capacity
  • End-to-end project management from design to commissioning
  • Network-enabled stations with billing and access control
  • Incentive program navigation and application support
EV Charging Solutions We Install

Pick the Right Setup in 30 Seconds

6-19kW Power Output

Level 2 · MURB Charging

Ideal for residential buildings and condos. Full charge in 4 to 8 hours with 208V or 240V power for overnight resident parking.

  • Resident parking stalls
  • Overnight charging
  • Individual metering
  • Scalable infrastructure

6-19kW Power Output

Level 2 · Office Charging

Workplace charging for employees during business hours. Full charge in 4 to 8 hours makes it perfect for 8-hour workdays.

  • Employee parking lots
  • Daytime charging
  • Workplace benefits
  • Fleet vehicles
Where EV Charging Fits

From a Few Stalls to a Full Fleet Depot

🏢

Office Buildings

Workplace charging with access control and billing, employer-subsidized or paid.

🏬

MURBs & Condos

Resident charging with individual metering and load management that scales as adoption grows.

🛍️

Retail & Hospitality

Customer charging that draws EV drivers and lengthens dwell time.

🚚

Fleet Operations

Depot charging for delivery, service, and municipal fleets, scheduled for overnight load.

Our Turnkey Installation Process

From Assessment to Commissioning

1

Site Assessment

Electrical capacity analysis, parking layout evaluation, and charging station placement recommendations.

2

Engineering Design

Load calculations, panel upgrades, conduit routing, and smart management system specifications.

3

Installation & Testing

Professional electrical work, charger mounting, network configuration, and comprehensive system testing.

4

Commissioning & Support

ESA inspection, network activation, user training, and ongoing technical support and maintenance.

Why Operators Choose Engineered EV

The Chargers Are the Easy Part

This is what keeps the rollout on budget and on schedule.

01

Professional Engineering Support

What we bring

Professional engineering load calculations, code compliance, and utility coordination

What it means for you

A design that clears ESA and Toronto Hydro the first time

02

Smart Load Management

What we bring

Intelligent load sharing across chargers on your existing service

What it means for you

Up to 60% less infrastructure cost, often with no service upgrade

03

Turnkey Project Management

What we bring

One point of contact across engineering, permits, install, and commissioning

What it means for you

No coordinating 5 trades yourself

04

Tesla Certified Installer

What we bring

Certified Wall Connector installs with direct manufacturer support

What it means for you

Full warranty coverage and factory-backed hardware

05

Incentive Navigation

What we bring

Federal and provincial rebate paperwork handled end to end

What it means for you

Maximum funding captured, nothing left on the table

06

Future-Proof Design

What we bring

Scalable infrastructure sized for the chargers you'll add later

What it means for you

Expansion without paying to rip and replace

The Engineering Partner Toronto Trusts

Licensed Energy Professionals

Industry-leading credentials that ensure excellence and compliance.

PEO

Professional Engineers Ontario

Professional engineering accountability on every project, by Ontario-licensed engineers

CEM

Certified Energy Managers & Auditors

Energy efficiency experts with the Association of Energy Engineers (AEE)

ECRA

Licensed Electrical Contractor

Partnered with Morava Electric ECRA/ESA #7008817

TESLA

Tesla Certified Installer

Certified for Powerwall 3 battery systems and Wall Connector EV chargers

HYDRO

Toronto Hydro Cleantech

Service Network Member for electrification & energy efficiency solutions

Straight Answers

EV Charging Questions

The kind we would give before you commit a dollar of capital. Tap a question.

Can we add chargers without a service upgrade?
Often, yes. Smart load management can cut infrastructure cost by up to 60% and frequently avoids a service upgrade entirely.
How do we charge a whole fleet overnight?
With staged depot charging. We design load management and scheduling sized to your existing service.
What about MURB resident charging and billing?
Handled. We set up individual metering, access control, and billing integration.
Are there rebates?
Yes. We coordinate federal and provincial incentives and build them into the project numbers.
Will it scale as we add vehicles?
Yes. We design future-proof infrastructure so expansion does not mean a costly retrofit.
How much downtime to install?
Minimal, and staged around your operations.
Who designs and installs?
Engineering by a licensed Professional Engineer (PEO), including Tesla Wall Connector installations through our licensed contractor partner, Morava Electric (ECRA/ESA #7008817).
Complimentary Capacity Review · 3 Business Days

Charge the Fleet Without Blowing the Budget

The expensive mistake in EV charging isn't the chargers, it's discovering mid-project that your service can't carry them. We assess capacity first with real interval data, then design a staged rollout that uses what you have and adds only what you need. We confirm receipt within 2 business days and send your plan within 3.

Prefer to talk it through first? Call (416) 670-4030

Got utility bills, plans, permits, photos, or contractor quotes ready? Attach them here. Up to 5MB per file. PDF, JPG, PNG, CSV, XLSX, DWG.

If you didn't upload above, just check what you have. We'll email you within 2 business days to coordinate.

We confirm receipt within 2 business days, then send your full assessment within 3 business days. No sales calls. Your details stay confidential.