A family home turned its garage into the energy centre of the house: four Tesla battery units, 13.5 kW of rooftop solar, an EV charger, a ductless heat pump, new LED lighting and a subpanel to run it all. We engineered it end to end, from the home's own utility data to the utility connection and the Electrical Safety Authority plan review.
Plan My Home Microgrid →Prefer to talk? Call (416) 670-4030Fixed quote within 1 to 2 business days, sized on your own data.

Newmarket Home Microgrid



A garage that became the energy centre
The owners were renovating their three-bay garage into a gym and workshop, and wanted the house ready for what comes next: solar, an EV, heat pump comfort and backup for the whole home, without a generator.
The house uses about 13,200 kWh a year and already had a hot tub and a pool. Rather than bolt equipment on one piece at a time, we planned it as one system: a garage subpanel for the new loads, and batteries sized to carry the whole house and store its solar.
What they asked for
- Whole-home backup, automatic, no generator
- Solar that pays its way all year
- A heated and cooled garage gym and workshop
- EV charging that never drains the backup
What we brought
- Load assessment on a year of utility data
- Engineered single-line drawing and layouts
- Utility connection, start to finish
- ESA permits, inspections and plan review
Six systems, one plan
What went in, and why each one is there.
Battery storageTwo Tesla Powerwall 3s and two Expansions
54 kWh stored · 23 kW output- What we did
- Four Tesla battery units on the garage wall, each Expansion mounted behind its Powerwall. Two inverters supply the house; the Expansions add stored energy.
- Why
- Whole-home backup with no load left out, and enough storage to move the house's evening use to cheaper hours every day.
13.5 kW of solar, straight into the Powerwalls
27 panels · about 11,500 to 12,000 kWh a year- What we did
- Four roof faces, six strings, wired into the six solar inputs built into the two Powerwall 3s. No separate solar inverter.
- Why
- Roughly 90% of what the home uses in a year, and it recharges the batteries during a long outage.
EV charger48 A Level 2 charger
11.5 kW on a 60 A circuit- What we did
- Hard-wired charger on the block wall beside the batteries, fed from the main panel.
- Why
- A contactor drops the charger the moment the grid goes down, so the car never drains the house battery. It reconnects after five minutes of steady grid.
Garage subpanelNew 100 A garage subpanel
30 spaces, fed from the main panel- What we did
- One feeder from the house to a subpanel in the garage. The heat pump, lighting, receptacles and roof de-icing all start here.
- Why
- Short runs to the loads, the garage's circuits in one place, and spare spaces for whatever comes next.
Ductless heat pumpMulti-zone heat pump, two wall heads
35 A circuit · room for a third head- What we did
- A cold-climate outdoor unit with two ductless heads in the garage. We ran the circuit and disconnect; our HVAC partner set the heads and line sets.
- Why
- The garage became a heated and cooled gym and workshop, all year, with no gas.
LED panel lightingNine 2 x 4 ft LED flat panels
Two lighting circuits · three-way switching- What we did
- Three panels over the parking bays on three-way switches at the entry, six over the gym and work area. Three spare ceiling boxes are capped for later.
- Why
- Even, shadow-free light across the whole garage on very little power.
How 54 kWh earns its keep every day
Backup is the insurance. The daily value is timing: make or buy power when it is cheap, use it when it is expensive. Tap a time of day.
Solar runs the house and refills the batteries
Solar feeds the house first, then fills the 54 kWh. Anything left goes out to the grid, up to the 12 kW export limit agreed with the utility, and earns net-metering credit on the bill.
Credits carry forward to the darker months.
Over 12 kW, so it gets reviewed first
Most home battery jobs never need a plan review. This one does, and we treat that as part of the build, not a hurdle at the end.
No bigger service, by the numbers
We ran the Code demand calculation on the home's own utility data, with every new load included.
How a project like this comes together
- 1Data review. A year of the home's utility data shows how the house actually runs, hour by hour.
- 2Load assessment and sizing. The Code calculation confirms the service, and the batteries and solar are sized to the real loads.
- 3Design and approvals. Single-line drawing, layouts, the utility connection agreement, ESA permits and the plan review.
- 4Build. Garage subpanel and circuits, heat pump, lighting and EV charger, then the batteries and Gateway in a one-day service cutover.
- 5Commissioning and handover. ESA inspection, an outage test, the export limit set, and the owners set up in the Tesla app.
- 6Solar connects. The panels land straight on the Powerwalls' built-in solar inputs, with no separate inverter.
Solar, storage, EV and heat pump, planned as one system
Thinking about a home microgrid?
Send the address. We review your utility data, size the batteries and solar to how your home actually runs, and handle the utility and ESA approvals.
Start My Microgrid Plan →Tesla Powerwall installation · Active rebates · All case studies
Newmarket Microgrid Questions
The kind we would give before you commit a dollar of capital. Tap a question.
Why two Powerwall 3s and two Expansions instead of one?
Does a home battery over 12 kW need an ESA plan review in Ontario?
Why is the solar export limited to 12 kW?
What is energy arbitrage with a home battery?
Does the EV charge from the batteries during an outage?
Can solar connect straight to a Powerwall 3?
Did the house need a bigger electrical service?
Why put a subpanel in the garage?
Get a quote
Tell us about your home or building
Choose your property type and what you need. Send the address and a few details, and we will reply with a fixed quote.