Do you need a 200 amp panel for an EV charger?
Toronto homes, real numbers (2026)
Often, no. Many Toronto homes on a 100 A service can take a full-speed 48 A Level 2 charger, either straight in or with a certified load manager. The answer comes from 12 months of your own Toronto Hydro data, not from the number printed on the panel.
How the check works
This is the method ESA accepts for adding a charger to an existing home. It takes your real usage, not a guess.
- Pull 12 months of meter data. Toronto Hydro records your use every hour. Download it from your online account, or send us a recent bill and we help you get it.
- Find the highest demand. The single busiest hour of the year, usually a cold January evening or a hot July afternoon.
- Multiply by 1.25. ESA Bulletin 8-3-15 adds a 25% safety margin to the measured peak before anything new is added.
- Add the charger at its full rating. A car with an 11 kW onboard charger charges at 48 A, so 48 A goes on top. No discount for charging overnight.
- Compare with the service. If the total stays within the 100 A service, the charger goes straight in. If not, a certified load manager or an upgrade is next.
Three Toronto homes, all on 100 A
Same service size, three different answers. The difference is how each house actually uses power.
East Danforth: straight in
Midtown laneway house: straight in
East York: with a load manager
A full panel is not a full service
A panel with no free spaces looks full, but that is a space problem, not a capacity problem. Where the panel is rated for them, single breakers can be combined into tandem breakers to open a spot for the charger's two-pole breaker. That is what made room in the East Danforth home.
Capacity is a different question, and only the meter data answers it.
When a 200 A upgrade does make sense
An upgrade is the right call when the house is already close to its limit, when you are adding a heat pump, induction cooking and an EV charger at the same time, when the panel itself is old or unsafe, or when a home still has two meters and two panels to consolidate.
In a former duplex in the Beaches we merged two 125 A services into one 200 A service, sized on two years of meter data, with room for a heat pump later.
What a certified load manager is
An energy management system (EVEMS) watches the whole house and pauses or slows the charger when the home needs the capacity, then resumes. To count toward the Code calculation it must be certified as a device, to UL 3141. A monitoring app on its own does not qualify.
See it on real jobs
48 A charger on a full 100 A panel
East Danforth. 18 A peak, tandem breakers, installed in a day.
Read the case study →Load manager100 A, heat pump and a 48 A charger
East York. Certified load manager instead of an upgrade.
Read the case study →UpgradeTwo meters into one 200 A service
The Beaches. When the upgrade was the right answer.
Read the case study →Load assessment first
Get the answer for your home
Send your address, a photo of your panel and 12 months of Toronto Hydro data. We tell you which of the three answers fits your home and send a fixed quote within 1 to 2 business days.
Get My Load Check →Common Questions
The kind we would give before you commit a dollar of capital. Tap a question.
Can a 100 amp panel handle a Level 2 EV charger?
Is a load manager cheaper than a 200 amp upgrade?
Where do I get my Toronto Hydro data?
Does charging overnight mean I can skip the calculation?
What size charger should I install?