Mississauga Condo Towers
Freeing up capacity for EV charging, one upgrade at a time
Two 23-storey towers, about 400 suites, and lighting from the early 1990s. Over three years we replaced the garage and site lighting with LEDs, upgraded the amenities, modernized the backup power, and then used the capacity we had freed up to plan EV charging on measured data.
Book a Building Baseline →Prefer to talk? Call (416) 670-4030For condo boards and property managers in the GTA.

Two towers, one long to-do list
The towers share a two-level underground garage, a recreation centre with a pool and gym, and landscaped grounds. Almost every light was fluorescent, the garage ran at full brightness 24 hours a day, and parts of the site were dark at night.
The board wanted three things: lower operating costs, safer grounds, and a realistic path to EV charging for residents and visitors. We worked through it in phases, each one paying for or making room for the next.
Slide from old to new

BeforeAfterDrag the handle: left is before, right is after.
The original transfer switch: robust, but slow to respond, letting voltage swings from generator start-up reach sensitive equipment.
A modern transfer switch with a digital controller and bypass isolation, installed in the same spot in one planned shutdown.
- Clean, fast transfer that protects LED drivers and electronics
- Status shown on the controller, not guessed
- Bypass and isolation for safe maintenance without an outage
Where the capacity is, measured not guessed
Thermography first, to make sure the equipment was sound. Then a week of power logging on each candidate panel, and a capacity request to the utility.



Room for two or three Level 2 chargers for visitors straight away.
Room for 12 to 18 Level 2 chargers on new subpanels, with the load balanced across all three phases.
A full resident program needs the utility involved. The design uses dynamic load management so chargers share what is there.
The cheapest kilowatt is the one you stop using
Before anyone talks about a new service for EV charging, look at what the building already wastes.
The garage lights never turn off. So every watt counts, 24 hours a day.
Estimates from fixture wattages and sensor settings, rounded. With load management, the same capacity serves more chargers.
From tired poles to planned light
Swipe through the old site lighting, the changeover and the finished result.








Designed on paper, then built to match
Before a pole came down, every new head was modelled on the site plan to check the light reaches the drive, walkways and courtyard evenly.

- Designed on paper first. A photometric study placed every head before anything was dug.
- Poles replaced on new engineered concrete footings.
- LED area heads on photocell control, on at dusk and off at dawn.
- Wall packs, entrance canopies and bollards, all at one colour temperature.
- Outdoor receptacles replaced with weather-resistant ground-fault units.
Finding heat before it becomes a failure
Before relying on the equipment for more load, we scanned both electrical systems live, in winter when heating loads are highest, and reported against the CSA Z463 maintenance standard.


- Scanned live, no shutdown: main switchboards, distribution, transfer switches, generators, elevators and pumps.
- No critical faults found.
- Minor findings fixed early: a mismatched, overheating fuse and a corroded pump disconnect.
- Generator system checked: grounding, neutral and transfer switch configuration.
Six upgrades, planned as one program
Parking garage432 LED vapour-tight fixtures on two levels
- What we did
- Every two-tube fluorescent fixture came out. Sealed LED fixtures went in, each with a motion sensor that runs it at 30 percent until someone walks or drives by.
- The result
- A brighter garage that uses a fraction of the power, around the clock.
Grounds and polesArea poles, wall packs, canopies and bollards
- What we did
- Old area poles replaced on new engineered footings, with LED heads placed to fill the dark spots along the drive and courtyard. Wall packs, entrance canopies and bollards to match, all at one colour temperature.
- The result
- Even, controlled light where residents walk at night.
Gym, multi-purpose rooms, pool and change rooms
- What we did
- Slim LED pot lights and panels, new circuits so every treadmill has its own, and modern lighting and power in the shared rooms.
- The result
- Rooms residents use every day, brought up to date.
Backup powerAutomatic transfer switch replaced
- What we did
- The original transfer switch for the emergency generator was replaced with a modern unit and digital controller, with a temporary generator holding the life-safety loads.
- The result
- A faster, cleaner handover to the generator that protects the new electronics.
ThermographyInfrared scan of both electrical systems
- What we did
- Main switchboards, distribution, transfer switches, generators, elevators and pumps, scanned live with no shutdown and reported against the CSA Z463 maintenance standard.
- The result
- No critical faults, and the short list of items found was fixed before any became a failure.
EV readinessSeven-day power logging on the panels
- What we did
- Power loggers on each candidate panel for a week, a utility capacity request, and an engineered design for dedicated EV charging panels.
- The result
- A charging plan the board could put out to bid with confidence.
Paid back faster, disposed of properly
The garage alone saves about $16,000 a year
Every fixture was specified from the DesignLights Consortium or ENERGY STAR lists so the retrofit qualifies under the IESO Save on Energy Retrofit Program. The application was packaged with the fixture counts, before and after wattages, and specification sheets, and the incentive was approved and paid.
- Listed fixtures chosen before anything was ordered
- Motion sensors on the garage fixtures, which count as lighting controls
- Lower bills every month on top of the incentive
RecyclingMercury kept out of the landfill
Fluorescent tubes contain mercury. Every tube from the garage was staged, collected by a certified recycler and documented.
A transfer switch that protects what it powers
The original switch was robust but slow, and voltage swings during generator start-up were reaching sensitive equipment, including the new LED drivers. A modern switch with a digital controller transfers cleanly and reports its status. Tap through the changeover day.
Life-safety loads on the temporary generator
Utility feed locked out, inspector approves the temporary connection, and the emergency loads are carried by the rental unit.
On siteENERGABLEProjectLife safety never went dark
A 250 kW temporary generator was staged, cabled and taped off before the switch was touched, and carried the emergency loads all day with inspector approval at each connection.
In actionENERGABLECrewWired, torqued and inspected the same day
Line, load and control wiring landed and labelled, every lug torqued to the manufacturer's spec, then re-inspected before the building went back on utility power that evening.
The order that saves money
- Cut the base load first. LED and sensors in a 24-hour garage can free up the capacity the first chargers need.
- Claim the incentives. Choose listed fixtures and controls so the retrofit qualifies for Save on Energy.
- Recycle the tubes properly. Get a certificate for the board's records.
- Check the equipment you will rely on. Thermography and a transfer switch that responds properly.
- Measure, don't estimate. A week of logging per panel shows real headroom.
- Talk to the utility early. Site-level capacity decides how big phase one can be.
- Design for load management. Dedicated EV panels with smart charging stretch the capacity you have.
- Bid on one engineered scope. Comparable quotes, not a pile of different ideas.
How a building baseline works
- 1Walkthrough and records. Drawings, panel schedules, utility bills and a walk of every electrical room.
- 2Thermography and condition. Live infrared scans of switchgear, panels and the generator system, with no shutdown.
- 3Measured capacity. Power loggers on the panels that matter, and a capacity request to the utility.
- 4Engineering report. Findings, priorities and options, written for a board meeting.
- 5Design and bid support. One engineered scope, so bids are compared on equal terms.
- 6Delivery in phases. Lighting, controls, backup power and EV charging, each one making room for the next.
For condo boards and property managers
Know your building's capacity before you plan EV charging
Send the address. We start with a baseline of your electrical system and send a fixed quote within 1 to 2 business days.
Book a Building Baseline →Condo Building Questions
The kind we would give before you commit a dollar of capital. Tap a question.
How much electrical capacity does an LED retrofit free up in a condo garage?
Are there rebates for LED lighting retrofits in Ontario condos?
What happens to old fluorescent tubes?
Can a condo add EV chargers without a utility upgrade?
Why replace an automatic transfer switch?
What is a building baseline assessment?
Get a quote
Tell us about your home or building
Choose your property type and what you need. Send the address and a few details, and we will reply with a fixed quote.